CustomKraft POD System®

View Brochure in PDF
Back to Equipment Menu
POD Booklet PDF (870 KB)

CustomKraft has been constructing car washes for over 23 years.  When you choose CustomKraft,
you choose solid support.

           

CustomKraft’s modular Pre-cast Operation Depot (POD) is factory-manufactured using 5000#
concrete and steel in an automated production facility.  Built similar to a bank vault, the POD may
be set and secured to enhance any building construction.  The POD may stand independently or
be anchored to surrounding structure.

  • The POD is fully outfitted with equipment, plumbing and electrical to meet building codes.
  • Standard building ratings:  Wind 150 mph, Snow load 80 psf, Fire 4 hours and seismic zone 4.  
  • Available in a variety of exterior and interior finishes.
  • Standard with a 10-year structural warranty.

Product Description:  

Pre-cast Operations Depot (POD) features four-inch lightweight steel-reinforced concrete walls and roof, with an eight-inch pre-cast concrete floor (slab) fitted with four-inch foam insulation for reduced weight.  All equipment is anchored and installed, with in-room plumbing and electrical connections completed.  Concrete strength is designed and tested at 5,000 pounds per square inch (psi).

Modular POD Dimensions:

            Width      8’ to 12’

            Length    20’ to 40’

            Height    10’ to 12’

Exterior Finish

A selection of exterior finishes is available, including smooth concrete, split-faced block, faux brick, washed aggregate and painted/dyed surfaces.

Interior Finish

Typically, interior walls and ceiling are finished with epoxy paint on concrete.  Options include
fiberglass re-enforced plastic (FRP) walls, acoustical tile ceiling and 12”x12”x1/8” floor tile.

Steel Door

Standard in the POD is a 30x70 Supercore® steel door with polystyrene insulation cast-in steel frame, painted to match the exterior trim.  Door is equipped with non-removable pin ball bearing hinges,
Best dead bolt with construction core and heavy gauge stainless steel lock guard, door pull handles, automatic door closer with locking holder, door sweep, magnetic weather strip, drip strip over door
and a heavy-duty threshold.

Access Ports

Floor drain is located in the center of the POD.  Atmospheric venting has heavy duty louvers and
insect screens 8”x16” at 9’ height.  Other access ports are customized for each POD to include bill changer and vending opening(s), supply water inlet, water heater and boiler vents, equipment
delivery hoses and wiring, gas supply line and deicing manifold(s).

Electrical and Plumbing

Includes interior electrical panel with exterior disconnect and meter socket, GFI outlets and interior
light circuits, primary electrical connections to carwash equipment (specifications to be supplied by equipment manufacturer with cut-sheets and load requirements).  Interior plumbing includes copper supply piping for water, black pipe schedule 40 for natural gas and PVC drains and sewer vent, all plumbing complete to interior appliances.  Materials may vary due to local building codes and/or
building plan specifications. 

State Approval, Delivery, Off-Loading and Set-up

State approval to include three (3) sets of stamped drawings.  Delivery includes fuel surcharges, however, in the event the trailer be detained at site for equipment installation or any other reason, detaining rate will be charged at cost, plus 15%.  Off-loading includes crane (a normal eight (8) hours
or less per module).  Site must be accessible by all-weather roads with no site obstructions.  Set-up
to include connection of modules (if more than one unit is delivered to the same site), removal of brackets, installation of tie-downs, inspection, testing, and if necessary, repair of floor, walls, roof,
door hardware.

Site Preparation

The general contractor and/or site owner is responsible for all weather road access to the site,
building footings, anchor plates and connections specified in stamped drawings.  In addition, the contractor is responsible for utility connections to the building, tie-ins with other structures and equipment connections outside the module.

Modular POD Options

Multiple structure connection for double or triple-wide units.

Pitched roof with polyester fabric membrane roofing system.

Exterior awnings.

Onsite Installation

Site is to be graded and compacted.  The general contractor installs footings, rough-in plumbing
and electrical prior to shipment of the modular POD.  Shipping will vary according to distance, POD weight & Department of Transportation (DOT) routing.  The electrician(s) and plumber(s) should be
on site when the POD is installed to make necessary connections and adjustments when necessary.  Once the POD is set, secured and utilities connected, subsequent building connections and paving
may be installed.

 


CustomKraft Industries 4611 W. Bethany North Little Rock, Arkansas 72117
501-955-5959 800-869-1448 Fax: 501-945-3408